HOOSAC TUNNEL, EAST PORTAL, MASSACHUSETTS 9 20117
HOOSAC TUNNEL. Hoosac Tunnel was commenced in 1851 and long and completed ins 18751019he The total length is the 4¾ miles States. Rock tunnel in the United excavated employed during 1,900,000 tons. Men construction Lives lost 192. were about 900. Width 24 feet, height 20 feet. Equipped with Electoral service 1911. POST CARD THIS SPACE FOR ADDRESS ONLY PUBLISHED BY C. W. HUGHES& CO., INC., MECHANICVILLE, STAR OVALITY PLACE ONE CENT STAMP HERE
Thanks for looking!
😀
446
~-A6124-0511-09~-